BB-14 Stationary System Installation
- Make sure area where BB-14 is to be assembled is on level ground and enough room provided for future maintenance.
- Bolt both sections of BB-14 metal frames together using the two existing bolts provided.
- Place pump (provided) in secondary pit and plumb with minimum 1″ PVC schedule 40 pipe to the inlet fitting on the lower (filtration) tank.
- Be sure the included check valve is incorporated in this line, preferably near the pump.
- If installing Pre-Settle Tank system, plumb to system first then to the filtration box.
- Connect 1″ minimum PVC schedule 40 from the discharge side of outside polishing filters to the in-line chlorinator on shelf provided on the lower part of the tall stand.
- Plumb from the discharge side of the in-line chlorinator to the upper back side of reserve water holding tank with 1″ PVC schedule 40 pipe and fittings provided.
- Connect pressure washer using the 1″ threaded fitting provided on the underside of the reserve water supply tank. (Usually a rubber hose is used here.) This can vary from each installation’s preference.
- Fill chlorinator at least half full of Trichlor tablets and adjust to tinge of chlorine odor. This will take some time to adjust to individual use.
- Fill filtration tank (lower) to capacity and reserve water holding tank (upper) at least halfway with fresh water.
- Enough PVC fittings are provided for a standard installation. Additional 1″ PVC pipe may be required depending how far from the wash rack the system is being installed.